This project offered many challenges as this was the first time I worked on the site of an airport. Significant restrictions regarding the safety zones made if difficult for placing structures and providing proper access between pilots, airport staff, and fliers. Water and some vegetation attract wildlife that interferes with aircraft, therefore limiting these was necessary.
Thursday, January 3, 2013
Don Scott Field - Studio
The mission of this studio was to revitalize the OSU Airport - Don Scott Field in Columbus, OH to enhance the existing structures, increase hangar space, and bring in more business. This was a multidisciplinary group project and my primary objective was to develop the master plan for the airport. Our approach was to focus the attention on the undeveloped northern section of the site to have a new main entrance and provide infrastructure for businesses in the rapidly growing community. The existing airport infrastructure would be further developed for private use as the airport has a high demand for private hangar space.
Friday, July 6, 2012
Redefining the Downtown Edge
The ULI/Hines design competition is an annual interdisciplinary competition for graduate students primarily in architecture, landscape architecture, city and regional planning, as well as business. The competition from winter of 2012 was set in Houston, TX along the edge of downtown, isolated by the Buffalo Bayou and two major highways. Site program had minimal requirements to increase low income housing, revitalize the existing land, and to be an overall well designed area.
I participated in this particular competition with an architecture student and a city and regional planning student. Our design was based on the overarching idea to create a defined boundary to the downtown and a gateway to the residential communities just beyond the site. The primary objectives for the site were to enhance the natural environment and processes within the city, to create new points of access to the site from across the bayou for vehicles and pedestrians, increase urban living opportunities, and to provide an atmosphere conducive for socializing and entertaining.
My specific tasks were: board layout, diagrams, wetland design, and the site section. The architecture student and myself worked out the overall site design while she focused on producing the master plan and renderings. Project pro forma was completed by the city and regional planning student.
Final board layout
Districts in relation to pedestrian, vehicular, and light rail connections
Existing and proposed roadways
On site circulation
Site section
Wetland Section
Wetland plan
Enhance - Emphasize - Energize
This project addresses the toxic algal blooms that have flourished in Grand Lake St. Marys and how to creatively slow the progression of these blooms through landscape architecture. Grand Lake St. Marys is a man made lake built for the Miami/Erie canal system in the early 1800's and has since transformed into a recreational destination.The primary causes of the toxic algae are due to the shallow depth of the lake, lack of movement in the water, and the large agricultural community increasing the amount of nitrogen and phosphorous entering the lake through runoff.
My specific visionary plan focuses on emphasizing the culture of the surrounding area, dredging and enhancing infrastructures, as well as energy production through water flow. Culture is emphasized through creating more trails and pathways connecting regional sites, as well as updating the lighthouses around the lake to provide for additional recreational activities. Dredging will allow for the proper depth to support healthy ecosystems, decreasing the algal blooms as well as provide material for improving shoreline conditions. Energy will be collected at the existing spillway by adding turbines and generators to provide lighting for the promenade.
My specific visionary plan focuses on emphasizing the culture of the surrounding area, dredging and enhancing infrastructures, as well as energy production through water flow. Culture is emphasized through creating more trails and pathways connecting regional sites, as well as updating the lighthouses around the lake to provide for additional recreational activities. Dredging will allow for the proper depth to support healthy ecosystems, decreasing the algal blooms as well as provide material for improving shoreline conditions. Energy will be collected at the existing spillway by adding turbines and generators to provide lighting for the promenade.
Monday, January 30, 2012
Hydro Electric
This project was one of my most interesting so far as a graduate student. We began the quarter picking out an infrastructure that we would like to work with then redeveloped an element of it. I chose electric transmission lines and narrowed in on distribution substations. Something I noticed is the excess of land at most substations and the potential that land could have within the city. My project is very theoretical and I had a lot of freedom to be creative with it, so I took that opportunity to the fullest.
The design is to use the excess space at substations and create a park that would increase activity of local residents as well as create energy going directly into the grid. Energy would be created by: when people used the exercise equipment, water would be pumped to the top of this 'water tower', once the tower reached a certain capacity, the water would drop, creating electricity through hydro power.
The design is to use the excess space at substations and create a park that would increase activity of local residents as well as create energy going directly into the grid. Energy would be created by: when people used the exercise equipment, water would be pumped to the top of this 'water tower', once the tower reached a certain capacity, the water would drop, creating electricity through hydro power.
Friday, January 13, 2012
1st Year Design Studio
As one of my first projects in the architecture program at Kent State University, we worked mostly in model. The project was to create a museum within certain parameters of a section of a city block.
2nd Year Design Project
This project is from my 2nd year studio, sited in Cleveland Ohio. The program is set primarily for SRO housing and market space, designed so that people living within the facility are able to work in the market to establish a steady income.
Building Axonometric
Exploded Axonometric of housing units
Model - Roof Plan
Model Images
3rd Year Design Project
This project is from the Fall of my 3rd year of architecture at Kent State University. The site consists of 30 acres, set in Willoughby Hills, OH. and has a Frank Lloyd Wright Usonian home on the property. The Chagrin River runs through the site which led to a lot of research of watershed conditions and site typologies I had never dealt with. These are just a few images I have of the project, renderings are done with PrismaColor Markers. This was my first project working with these markers. This project definitely got me hooked on landscape architecture and marker renderings!
Frank Lloyd Wright Penfield house
Entrance/Spa Pavilion Plan
Private Spa Pavilion Plan
Iteration of Educational Amphitheater Plan
Educational Amphitheater Plan
Subscribe to:
Posts (Atom)
































